Dutch Drilling Consultants
 
 
   

Lanzarote Breakwater dam.


Lanzarote- Spain

Predrilling for a breakwater dam consistent of prefab concrete piles placed in predrilled hole of 1400mm with a self elevating platform and a WIRTH PBA 8010 Pile Top Drill Rig.

 

Development & Design: Ermeco Web-id | Copyright DDCBV © 2008